• Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto
  • Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto
  • Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto
  • Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto
  • Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto
  • Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto

Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto

Type: Carrosserie
Certification: ISO9001
Driving System Parts: Frame
Electrical System Parts: Starting System
Brake System Parts: Transmission
Transmission System Parts: Transmission Shaft
Samples:
US$ 90/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Trading Company
  • Overview
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
SDQ51/4PS-G PTO
Steering System Parts
Steering Transmission Device
Color
Black
OE No
Sdq51/4PS-G Pto
Product Name
Gearbox Power Take off
Size
OEM Standard Size
Material
Aluminum, Metal
Packing
Standard Package
Application
Heavy-Duty Truck
Quality
100% Professional Test
Payment
Tt/West Unioin /Paypal
Transport Package
Box
Trademark
Lianwo
Origin
Jinan
Production Capacity
500000/Year

Product Description



Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto
working life
long time
Application
dongfeng truck
Quality
high
Warranty
0.6years
Item Name
truck transmission parts SDQ51/4PS-G PTO
Function
normally
Sort
SDQ51/4PS-G
MOQ
1 set
Model Number
PTO
Price
standard
Delivey
3working days
Port
Ningbo/Shanghai

Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G PtoSinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G PtoSinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G PtoSinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto
What can we supply? 
   
   

1.Sinotruk/Weichai engine parts          
Crankshaft, connecting rod, cylinder block, cylinder head, piston,flywheel, cylinder liner,piston ,piston rings, piston pin,connecting rod,bearing, crankshaft bearing ,intake&exhaust valve, valvesprings,camshaft, tappets, camshafts bearing, fuel tank, fuel pump, fuel filter,air filter, oil filter, battery,alternator, starter, starter motor, ignition coil,water pump, radiator, fan couplings, fan, thermostat, oil pump,pressure limiting valve ..
                                                                

Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto

2.Sinotruk/FAST Gearbox Parts

Primary shaft, 2nd shaft, intermediate shaft, 2 / 3 associated gear,2nd speed gear(1/2/3/4/5) , reverse gear ,intermediate shaft(1/2/3/4/5),synchronize assembly, synchronizer slider,gearbox ,gearbox shell, gearbox cover, gearbox middle cover, shift fork assembly, PTO...
Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto

3.Chassis parts/Cabin spare parts

Clutch cover, clutch disk , wheel hub, brake drum, brake pads ,Brake shoes, lock, wiring harness, drive shaft, front axle, steering knuckle,steering arm, universal joints, rear axle , main reducer,differential,axle, planetary gears, sun gear, pinion and bevel gear, spring, shock absorbers, stabilizer bars,steering pole, straight rod, rod joint, wheel reducer, through axle, rear shell ... ..
Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto

 

 

WHY CHOOSE US:
1.we have 14 years experience in the business of auto spare parts
2.good quality,reasonable lower price
3.fast delivery 
4.with 24 hours online technical support
5.Sample will be offered before the trial order
Note: There are also kinds of products used for heavy truck for you to choose, if any need or interest, welcome to send us your detailed inquiry list.


Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto
 

Certifications
Sinotruk Truck Parts Gearbox Power Take off Sdq51/4PS-G Pto

 

FAQ

 

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

Send your message to this supplier

*From:
*To:
avatar Mr. John
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Trading Company
Number of Employees
5
Year of Establishment
2015-07-17