• Tonly 875 Front Headlamp Shade Assembly 85050015350
  • Tonly 875 Front Headlamp Shade Assembly 85050015350
  • Tonly 875 Front Headlamp Shade Assembly 85050015350
  • Tonly 875 Front Headlamp Shade Assembly 85050015350
  • Tonly 875 Front Headlamp Shade Assembly 85050015350
  • Tonly 875 Front Headlamp Shade Assembly 85050015350

Tonly 875 Front Headlamp Shade Assembly 85050015350

After-sales Service: 24 H Service
Warranty: 3 Month, 3 Month
Transmission Type: Manual
Power: Electric Energy
Load Capacity: 41-50t
Emission Standard: Euro 2
Samples:
US$ 60/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Trading Company
  • Overview
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
85050015350
Drive Wheel
6×4
Engine Capacity
4-6L
Seats
≤5
Horsepower
351-450hp
Tire Certification
ISO
Tire Design
Bias
Dumping Type
Front Lifting Style
Condition
New
Material
LED
Base
W21W
Voltage
24V
Function
Dipped Headlight, High Beam, Front Position Lamp
Resistance
Open-Circuit
Certification
CCC
After-Sales Service
3 Month
Brand
Lianwo
Key Words
Headlamp Shade
Parts Number
85050015350
OEM
Accept
MOQ
1 PCS
Payment
Tt/West Union
Delivery Time
2-7 Days
Transport Package
Box
Specification
690*220*180MM
Trademark
Lianwo
Origin
Jinan
Production Capacity
5000/Year

Product Description

 English Name TONLY 875 Front headlamp Shade Assembly
Model 85050015350
Weight: 7.96KG
Size 690*220*180MM
Truck Model: ShaanxiTonly TL875 TL875B
Delivery Time: 5days-7days
Production Capacity 5000/year
Minimum Order Quantity: 1
Payment Term T/T  D/P  L/C
Packing BOX


Company profile 
Tonly 875 Front Headlamp Shade Assembly 85050015350
 
What can we supply?                                                                                 

1.Sinotruk/Weichai engine parts

Crankshaft, connecting rod, cylinder block, cylinder head, piston,flywheel, cylinder liner,piston ,piston rings, piston pin,connecting rod,bearing, crankshaft bearing ,intake&exhaust valve, valvesprings,camshaft, tappets, camshafts bearing, fuel tank, fuel pump, fuel filter,air filter, oil filter, battery,alternator, starter, starter motor, ignition coil,water pump, radiator, fan couplings, fan, thermostat, oil pump,pressure limiting valve ..
Tonly 875 Front Headlamp Shade Assembly 85050015350

2.Sinotruk/FAST Gearbox Parts

Primary shaft, 2nd shaft, intermediate shaft, 2 / 3 associated gear,2nd speed gear(1/2/3/4/5) , reverse gear ,intermediate shaft(1/2/3/4/5),synchronize assembly, synchronizer slider,gearbox ,gearbox shell, gearbox cover, gearbox middle cover, shift fork assembly, PTO...
Tonly 875 Front Headlamp Shade Assembly 85050015350

3.Chassis parts/Cabin spare parts

Clutch cover, clutch disk , wheel hub, brake drum, brake pads ,Brake shoes, lock, wiring harness, drive shaft, front axle, steering knuckle,steering arm, universal joints, rear axle , main reducer,differential,axle, planetary gears, sun gear, pinion and bevel gear, spring, shock absorbers, stabilizer bars,steering pole, straight rod, rod joint, wheel reducer, through axle, rear shell ... ..
Tonly 875 Front Headlamp Shade Assembly 85050015350

 


WHY CHOOSE US:
1.we have 14 years experience in the business of auto spare parts
2.good quality,reasonable lower price
3.fast delivery 
4.with 24 hours online technical support
5.Sample will be offered before the trial order
Note: There are also kinds of products used for heavy truck for you to choose, if any need or interest, welcome to send us your detailed inquiry list.


Tonly 875 Front Headlamp Shade Assembly 85050015350
 

Certifications
Tonly 875 Front Headlamp Shade Assembly 85050015350

 

FAQ

 

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Trading Company
Number of Employees
5
Year of Establishment
2015-07-17